Refine
Document Type
Conference Type
- Konferenzartikel (2)
Language
- English (7) (remove)
Has Fulltext
- yes (7) (remove)
Is part of the Bibliography
- yes (7)
Keywords
- Battery energy management system (1)
- Building automation system (1)
- Edge control (1)
- Fault detection (1)
- Intelligent Buildings (1)
- Online simulation (1)
- Photovoltaics (1)
- Plant commissioning (1)
- Software (1)
- aging characteristics (1)
Institute
Open Access
- Open Access (7)
- Bronze (3)
- Gold (2)
Recently, photovoltaic (PV) with energy storage systems (ESS) have been widely adopted in buildings to overcome growing power demands and earn financial benefits. The overall energy cost can be optimized by combining a well-sized hybrid PV/ESS system with an efficient energy management system (EMS). Generally, EMS is implemented within the overall functions of the Building Automation System (BAS). However, due to its limited computing resources, BAS cannot handle complex algorithms that aim to optimize energy use in real-time under different operating conditions. Furthermore, islanding the building's local network to maximize the PV energy share represents a challenging task due to the potential technical risks. In this context, this article addresses an improved approach based on upgrading the BAS data analytics capability by means of an edge computing technology. The edge communicates with the BAS low-level controller using a serial communication protocol. Taking advantage of the high computing ability of the edge device, an optimization-based EMS of the PV/ESS hybrid system is implemented. Different testing scenarios have been carried out on a real prototype with different weather conditions, and the results show the implementation feasibility and technical performance of such advanced EMS for the management of building energy resources. It has also been proven to be feasible and advantageous to operate the local energy network in island mode while ensuring system safety. Additionally, an estimated energy saving improvement of 6.23 % has been achieved using optimization-based EMS compared to the classical rule-based EMS, with better ESS constraints fulfillment.
Building energy management systems (BEMSs), dedicated to sustainable buildings, may have additional duties, such as hosting efficient energy management systems (EMSs) algorithms. This duty can become crucial when operating renewable energy sources (RES) and eventual electric energy storage systems (ESSs). Sophisticated EMS approaches that aim to manage RES and ESSs in real time may need high computing capabilities that BEMSs typically cannot provide. This article addresses and validates a fuzzy logic-based EMS for the optimal management of photovoltaic (PV) systems with lead-acid ESSs using an edge computing technology. The proposed method is tested on a real smart grid prototype in comparison with a classical rule-based EMS for different weather conditions. The goal is to investigate the efficacy of islanding the building local network as a control command, along with ESS power control. The results show the implementation feasibility and performance of the fuzzy algorithm in the optimal management of ESSs in both operation modes: grid-connected and islanded modes.
The significant market growth of stationary electrical energy storage systems both for private and commercial applications has raised the question of battery lifetime under practical operation conditions. Here, we present a study of two 8 kWh lithium-ion battery (LIB) systems, each equipped with 14 lithium iron phosphate/graphite (LFP) single cells in different cell configurations. One system was based on a standard configuration with cells connected in series, including a cell-balancing system and a 48 V inverter. The other system featured a novel configuration of two stacks with a parallel connection of seven cells each, no cell-balancing system, and a 4 V inverter. The two systems were operated as part of a microgrid both in continuous cycling mode between 30% and 100% state of charge, and in solar-storage mode with day–night cycling. The aging characteristics in terms of capacity loss and internal resistance change in the cells were determined by disassembling the systems for regular checkups and characterizing the individual cells under well-defined laboratory conditions. As a main result, the two systems showed cell-averaged capacity losses of 18.6% and 21.4% for the serial and parallel configurations, respectively, after 2.5 years of operation with 810 (serial operation) and 881 (parallel operation) cumulated equivalent full cycles. This is significantly higher than the aging of a reference single cell cycled under laboratory conditions at 20 °C, which showed a capacity loss of only 10% after 1000 continuous full cycles.
Sustainable Aspects force a building manager to continuous observation of actual states and developments concerning building use, energy and media flows.In the presented approach a communication structure was built up to use different software applications and tools in order to optimize the operation of the building.
In this paper, a new method is demonstrated for online remote simulation of photovoltaic systems. The required communication technology for the data exchange is introduced and the methods of PV generator parameter extraction for the simulation models are analysed. The method shown for parameter extraction from the manufacturer data is especially useful for the commissioning procedure, where the measured installed power is transferred to standard test conditions using the simulation model and can then be easily compared with the design power. At a simulation accuracy of 2% using the software environment INSEL ® any problems with the PV generator can reliably be detected. Online simulation of a grid connected PV generator is then carried out during the operation of the photovoltaic plant. The visualisation includes both the monitored and the simulated online data sets, so that a very efficient fault detection scheme is available. The method is implemented and validated on several grid connected photovoltaic power plants in Germany. It is excellently suited to provide automatic and real time fault detection and significantly improve the commissioning procedure for photovoltaic plants of all sizes.