Innovative combined heat, cold and power (Trigeneration) at Offenburg University of Applied Sciences
(2013)
The aim of the paper was to investigate the energy saved in the shift from separate generation of thermal and electrical energy to trigeneration at the energy facility in Offenburg University of Applied Sciences (HS OG). The energy facility at HS OG used a traditional heating system and electricity from grid until 2007 afterwhich they installed a trigeneration system to meet its continuously changing dynamic thermal and electrical demands. This paper highlights the methodology that had been derived to analyze and study the effect of this shift based on the energy consumption data available from 2004 to 2011, which were scarce due to the limited monitoring. From the energy analysis, we concluded that 8 % primary energy was saved in this shift at the energy facility of HS OG. And from economical perspective 5 % useful thermal energy and 39 % useful electrical energy was saved in this shift at the energy facility of HS OG. Nevertheless, the term energy saving, in general, is very relative and complex to define in such a changeover.
The energy supply of Offenburg University of Applied Sciences (HS OG) was changed from separate generation to trigeneration in 2007/2008. Trigeneration was installed for supplying heat, cooling and electrical power at HS OG. In this paper, trigeneration process and its modes of operation along with the layout of the energy facility at HS OG were described. Special emphasis was given to the operation schemes and control strategies of the operation modes: winter mode, transition mode and summer mode. The components used in the energy facility were also outlined. Monitoring and data analysis of the energy system was carried out after the commissioning of trigeneration in the period from 2008 to 2011. Thus, valuable performance data was obtained.